Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 85 results ...

Abdullah, A M and Vickridge, I G (2000) The extent of multi-project management implementation in the UK construction industry. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 137–46.

Akintoye, A, Beck, M, Hardcastle, C, Chinyio, E A and Asenova, D (2000) Management of risks within the PFI project environment. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 261–70.

Allan, C, Sommerville, J, Kennedy, P and Robertson, H (2000) A business unit approach to construction process re-engineering. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 335–42.

Atkins, J and Wild, A (2000) Automotive facilities procurement and the new construction paradigm. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 189–98.

Atkinson, B (2000) INCA: a retrospective performance tool for project management. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 537–44.

Bártolo, H M G (2000) Improving the value of design: a quality/cost approach. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 667–73.

Ball, D and Fortune, C (2000) Building project procurement processes and the development of environmentally friendly housing schemes. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 271–9.

Birgonul, M T and Ozdogan, I D (2000) Competitiveness of Turkish contractors in international markets. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 95–104.

Birnie, J (2000) Assessing the extent of construction management research in the UK by means of the RAE, and the ARCOM and COBRA conferences. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 3–10.

Boyd, D and Danks, S (2000) An analysis of 'the architectural practice' in the construction industry. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 693–702.

Bresnen, M and Marshall, N (2000) Learning to co-operate and co-operating to learn: capturing knowledge of partnering in construction. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 313–23.

Cheetham, D W (2000) Improving site safety: enforcement of the CDM regulations. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 442–51.

Dainty, A R J and Moore, D R (2000) The performance of integrated D&B project teams in unexpected change event management. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 281–9.

Dainty, A R J, Harty, T E and Neale, R H (2000) Improving employee resourcing within large construction organizations. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 49–59.

Dawood, N N (2000) Forecasting of cost indices in the Greek construction industry: a joint methodology approach. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 597–604.

Doyle, A and Hughes, W (2000) The influence of project complexity on estimating accuracy. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 623–34.

Dulaimi, M F and Kumaraswamy, M M (2000) Procuring for innovation: the integrating role of innovation in construction procurement. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 303–12.

Dunlop, P and Smith, S (2000) Stochastic modelling of concrete operations. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 483–91.

Egbu, C O (2000) Knowledge management in construction SMEs: coping with the issues of structure, culture, commitment and motivation. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 83–92.

Egbu, C O and Bernard, P (2000) Organizational core competencies and their influence on strategic partnering in registered social landlords (RSLS). In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 127–35.

Fortune, C and Lees, M (2000) Strategic cost advice and the effect of cognitive error. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 615–22.

Fraser, C (2000) Stakeholder evaluation of management performance: a study of construction site managers. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 715–21.

Fujimoto, A, Matsui, K, Ozawa, K and Muratsubaki, Y (2000) New design standard for civil engineering structures based on the minimum labour concept. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 473–82.

Ganah, A, Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 833–42.

Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 781–92.

Gorse, C A, Emmitt, S, Lowis, M and Howarth, A (2000) A critical examination of methodologies for studying human communication in the construction industry. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 31–7.

Gorse, C A, Emmitt, S, Lowis, M and Howarth., A (2000) Interaction analysis during management and design team meetings. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 763–9.

Greene, A, Root, D and Thorpe, A (2000) The comfort blanket of risk assessment: an investigation into the subjective assessment of risk. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 241–9.

Gunning, J G (2000) Models of customer satisfaction and service quality as research instruments in construction management. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 21–30.

Hampson, K, Peters, R, Walker, D and Tucker, S (2000) Project alliancing and information technology in building construction: the national museum of Australia. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 199–208.

Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 657–66.

Hill, C (2000) Professionally accredited industrial experience: a proposal. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 39–45.

Hill, C and Rodgers, J (2000) Project partnering arrangement for delivery of a tight scheduled project. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 413–9.

Hinks, J, Cuckow, H, Wright, H and Hardcastle, C (2000) The use of the internet for enhanced knowledge management in the construction industry. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 823–32.

Hogg, K (2000) The impact of information sequence in the construction domain. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 843–50.

Howarth, T, Stoneman, G and Hill, C (2000) A review of the construction (design and management) regulations. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 433–41.

Hugill, D (2000) Management as an accomplishment of project team meetings in construction. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 755–62.

Kelly, J, Male, S and Gronqvist, M (2000) Characteristics of refurbishing retailers as clients of the construction industry. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 675–82.

Kempton, J, Nicol, S, Anumba, C J and Dickens, J (2000) Analysis of surveyor variability from data obtained from surveys of dwellings represented on video film. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 635–43.

Kenley, R and Heywood, C (2000) Corporate real estate management practice: contrasts between financial and service provision priorities in corporate and government organizations. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 157–66.

Khosrowshahi, F (2000) A radical approach to risk in project financial management. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 547–56.

  • Type: Conference Proceedings
  • Keywords: cash flow; corporate objectives; financial management; risk
  • ISBN/ISSN: 0 9534161 4 3
  • URL: http://www.arcom.ac.uk/-docs/proceedings/ar2000-547-556_Khosrowshahi.pdf
  • Abstract:
    In construction, the organisation's structure, activities, functions and the environment under which they operate have become highly complex. Despite significant improvement in the sophistication of business analytical tools, the increasing level of uncertainty has placed risk management in the forefront of business activity. However, there is no clear-cut recipe for risk management. Organisational attitude toward risk varies from one extreme to another. It appears that the general recommendation is that risk should be contained and uncertainties minimised. In this paper the concept of risk is considered from a different perspective. It is argued that while all efforts to minimise uncertainties are justified, business risk should also be considered as an instrument for gaining advantage. The paper examines the above contemplation within the context of project financial management and its relation to an organisation's corporate financial objectives. A forecasting model, developed by the author, is used to apply the above notion to a case-example, as a scenario, to a real past school project. The results suggest that a proactive approach to project financial management can yield benefits to all parties involved in the project.

Kirkham, R J and Boussabaine, A H (2000) Developing a framework for whole of life costing in the National Health Service estate. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 567–76.

Kishk, M and Al-Hajj, A (2000) Fuzzy modelling of life cycle costs of alternatives with different lives. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 577–86.

Lawther, P M (2000) Predictive cost modelling: investigation utilising a qualitatively biased research methodology. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 605–14.

Leung, W Y (2000) A conceptual framework and research method for analysing the performance of construction firms in Hong Kong. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 105–15.

Li, B, Akintoye, A and Hardcastle, C (2000) Conceptual framework for construction public private partnerships. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 229–40.

Lihua, R and Greenwood, D (2000) Technology transfer in international joint venture projects in China. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 365–73.

Lingard, H (2000) The relationship between 'family friendly' employment practices and the well-being and satisfaction of white collar employees in the construction industry.. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 61–71.

Lopes, J and Ribeiro, F L (2000) The construction industry in Portugal: macroeconomic analysis and future trends. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 167–76.

Ma, C-P and Winch, G (2000) IT implementation performance and organisational characteristics in Taiwanese contractors. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 793–801.

Mak, M Y, Ng, S T, Chen, S E and Varnam, M (2000) The relationship between Economic indicators and Bromilow's time-cost model: a pilot study. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 587–95.

Marasini, R and Dawood, N (2000) A simulation model to manage and optimise stockyard layout: a case study in precast concrete products industry. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 527–36.

McCabe, S and Robertson, H (2000) Striving to be the best: a case study of construction benchmarking world class organizations. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 355–64.

Millett, S J, Dainty, A R J, Briscoe, G H and Neale, R H (2000) Towards an integrated construction supply network: Sub-contractors perspectives. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 705–14.

Murray, M D, Tookey, J E, Langford, D A and Hardcastle, C (2000) Project communication variables: a comparative study of US and UK construction industry perceptions. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 813–22.

Nielsen, Y and Ă–zbay, F O (2000) Information flow models for large scale public projects. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 803–12.

Nkado, R N (2000) Competencies required by quantity surveyors in South Africa. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 11–20.

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 557–65.

Okoroh, M I (2000) An evaluation of residential speculative developers' subcontractors perceived risks. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 291–9.

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 493–500.

Parvar, J, Lowe, D, Margaret Emsley and Duff, A R (2000) Neural networks as a decision support system for the decision to bid process. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 209–17.

Pasquire, C L and King, J H J (2000) Project team performance within the Scottish water market based private finance initiative. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 251–60.

Pinder, J and Wilkinson, S J (2000) The obsolescence of office property: a new research agenda. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 375–84.

Pipattanapiwong, J and Watanabe, T (2000) Multi-party risk management process (MRMP) for a construction project financed by an international lender. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 219–28.

Preece, C, Moodley, K and Hyde, J (2000) Knowledge management strategies to improve construction business development processes: a preliminary case study. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 325–34.

Proverbs, D G, Holt, G D and Cheok, H Y (2000) Construction industry problems: the views of UK construction directors. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 73–81.

Reaney, M, Griffith, A, Watson, P A and Ellis, C (2000) Optimizing functional relationships for new residential developments. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 683–92.

Ren, Z, Anumba, C J and Ugwu, O (2000) Towards a multi-agent system for construction claims negotiation. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 385–93.

Ribeiro, F L (2000) The applicability of the quality assurance requirements of the ISO 9000 conformance standards in construction. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 501–8.

Rogerson, J H, Morris, J P and Jared, G E M (2000) Development of a generic design-decision planner. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 647–55.

Ruddock, L (2000) Information on the construction sector: a world-wide survey. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 177–85.

Smith, L J (2000) The need for a pro-active methodology to reduce health and safety inefficiencies within a construction organization. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 743–52.

Smithers, G L (2000) The effect of the site environment on motivation and demotivation of construction professionals. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 455–64.

Sommerville, J and Campbell, C (2000) Project management: the role paradigm shift. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 723–32.

Sommerville, J, Farquhason, S and Campbell, C (2000) The Potential influence of institutional investors on construction organizations. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 147–56.

Sturges, J and Bates, M (2000) Thriving on chaos: the result of poor planning: some views from the housebuilding sector. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 519–25.

Suraji, A and Duff, A R (2000) Construction management actions: a stimulant of construction accident causation. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 733–42.

Talyor, K and Watson, A (2000) Benchmarking systems in construction: a prototype tool for system selection. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 343–53.

Teo, M M M, Loosemore, M, Marosszeky, M, Karim, K and Gardner, D (2000) Operatives' attitudes towards waste on construction project. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 509–17.

Watts, N, Watson, P A and Griffith, A (2000) The role of project managers in partnering arrangements. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 405–11.

Wong, C H, Holt, G D and Harris, P T (2000) UK civil engineering practitioners' perceptions of contractor prequalification criteria. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 421–31.

Xiao, H, Proverbs, D G, Shaw, T and Holt, G D (2000) A new approach to comparing the performance of contractors internationally. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 117–25.

Xie, X, Thorpe, A and Baldwin, A N (2000) A survey of communication issues in construction design. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 771–80.

Yisa, S B, Holt, G D and Zakeri, M (2000) Factors affecting management motivation in the Iranian construction industry: a survey of site managers. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 465–72.

Zhang, X-Q and Kumaraswamy, M M (2000) Choosing concessionaires in BOT-type projects. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 395–404.